Worker injured while operating machinery without knowledge of the safe work method statement
The Case
WorkSafe Victoria v Polymaster Pty Ltd (2023)
Polymaster Pty Ltd is a manufacturer of liquid storage products, such as tanks, for industries including agriculture, mining, food and beverage, chemical and water authorities. Polymaster’s factory is located in Swan Hill (workplace).
Polymaster employed a trades assistant to make metal tags for the lids of tanks and perform welding tasks as required. The employee was required to use a machine, among others, known as a belt sander, which is used to sand and smooth out pieces of metal.
The wide belt sander is approximately 1 metre high, with the sanding belt at the front about 200 millimetres wide. Metal is placed against the rotating belt to grind the metal down. There was a resting plate at the bottom of the belt.
From the experts behind the Health & Safety Handbook, the Bulletin brings you the latest work health and safety news, legal updates, case law and practical advice straight to your inbox every week.